The January 5, 2026 issue covers six commercial sales recorded across New Orleans and surrounding markets the previous week. The headline deal: BD OZ CBD NOLA LLC bought a school property on Carondelet Street originally built in 1937. Retail made up three of the six sales, including a Gerber Collision & Glass-occupied property on Kenner Avenue and a California-based company's purchase of a retail property on General Meyer Avenue.
Commercial Sales Recorded Last Week 6 sales

727 Carondelet St
Originally built in 1937, this school property sells on Carondelet Street.
BuyerBD OZ CBD NOLA LLC

2118 Kenner Ave
A retail property, occupied by Gerber Collision & Glass sells on Kenner Avenue.
BuyerAGREE STORES, LLC

3908 River Rd
A retail property sells on River Road.
BuyerBLACK ELIZABETH B

4855 General Meyer Ave
A California-based company acquires a retail property on General Meyer Avenue.
BuyerVOJE LLC

3240 Law St
A 1.8+ acre parcel of land sells on Law Street.
BuyerMORRIS JEFF COMMUNITY SCHOOL

427 Gravier St
A 6-unit hotel permitted property changes hands on Gravier Street.
Buyer427 GRAVIER STREET LLC
Commercial Permits Issued Last Week 132 permits
| Address | Type | Value | Description | Owner / Applicant / Contractor |
|---|---|---|---|---|
| 101 Morgan St | Renovation (Structural) | $9,032,363 | Alteration of existing ferry terminal building, ferry approach and surrounding site. Overhead canopy for weather protection to be added to existing ferry approach bridge. A second floor, elevator and stair will be added to the existing ferry terminal building. Surrounding site, including the public right-of-way, will be renovated to create a new plaza area with new stairs and accessible sloped walks to the terminal building. All work to be done as per plans. *FINAL INSPECTION* FEMA EC BFE +20.32 NAVD | O The City Of New Orleans, State Of Louisiana-CccA West StudioC C.D.W. Services, LLC |
| 1315 Jackson Ave | New Construction | $6,687,961 | Constuction of a new dining hall for Trinity Episcopal School. PHASED RELEASE ISSUED 12-1-25 | O —A Edr ArchitectsC Woodward Design & Build, LLC |
| 2275 Sanctuary Dr Apt 230 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 228 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 226 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 225 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 224 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 223 | Electrical Service / Circuit / Feeder | $1,540,960 | New circuits and meter | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 222 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C — |
| 2275 Sanctuary Dr Apt 221 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 220 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 219 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 218 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 217 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 216 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 215 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 214 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 213 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 212 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C — |
| 2275 Sanctuary Dr Apt 211 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 210 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 209 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 208 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 207 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 206 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 205 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 204 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 203 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 202 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 201 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 135 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 133 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meters and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 111 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 109 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 110 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 108 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 106 | Electrical Service / Circuit / Feeder | $1,540,960 | New meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 107 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 105 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 104 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 103 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 2275 Sanctuary Dr Apt 102 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C — |
| 2275 Sanctuary Dr Apt 101 | Electrical Service / Circuit / Feeder | $1,540,960 | New Meter and Circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Building 4 LLCA Larry Lee Beachler Jr.C Larry Lee Beachler Jr. |
| 1431 Saint Louis St Apt 205 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St FIRE PUMP | Electrical Service / Circuit / Feeder | $1,430,121 | Install 200 amp meter can and all electrical work associated with fire pump. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 108 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 309 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 402 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 301 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 109 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 206 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 302 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 310 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 207 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 403 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 102 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 311 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 110 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 303 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 208 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 103 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 404 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 405 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 209 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 304 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 104 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 305 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 105 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 201 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 406 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 306 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 106 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 202 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 210 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 407 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 307 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 203 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 211 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 107 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 408 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 308 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 204 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 410 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 409 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 1431 Saint Louis St Apt 411 | Electrical Service / Circuit / Feeder | $1,430,121 | Install all electrical for unit. Includes 17 circuits with a 150 amp subpanel. | O Housing Authority of New OrleansA Christopher Jake LabordeC RNGD Builders LLC |
| 921 Canal St | Renovation (Non-Structural) | $686,961 | The general extent of the limited exterior renovation work is described in the Contract Document and includes, but is not necessarily limited to the items indicated below. Repairs and replacement of damaged waterproofing systems including: a. Metal Cornice Flashing b. Metal Cap Flashing c. Membrane and liquid membrane flashing d. EIFS repair and replacement associated with the Metal Flashing | O WH Holdings LLCA Benjamin GooteeC Gootee Construction |
| 7320 Patterson St | Renovation (Non-Structural) | $505,637 | Renovation of existing ferry maintenance building. | O —A West StudioC C.D.W. Services, LLC |
| 5400 Magazine St | Construction Loop | $429,000 | Installation of a temporary power pole for a job site trailer and power for the construction site. | O Boutique Jefferson LLCA Kirk Joseph BoudreauxC Kirk Joseph Boudreaux |
| 6048 Perrier St Unit 3K | Renovation (Structural) | $353,207 | Interior renovation to an existing condo unit in an existing multi-family residential structure. Minor exterior painting. | O Lasalle Development LLC, Esp Properties LLC, Marsha D O'connor, Lasalle 6048-2C LLC, Hans A Jonassen, Michael G Thompson Children's Trusts, Fifth Grade LLC, Robert Eason Leake, Lee Richards II McMillan, Louis Y Fishman, Phillips Nathaniel P Jr, McKayA Kelly JohnsonC MGI Construction L.L.C. |
| 1901 Elysian Fields Ave, 2201 N Prieur St | New Construction | $247,700 | New construction 2 unit home, part of a 4 unit Small Multi Family Affordable construction. Two family, 2 story, 6 bedroom, 6 bath 2,731 foot living area. Built according to plans. THIS PERMIT IS ONLY FOR THE MAIN HOUSE AS PER PLANS. | O Katawan V FletcherA Girard CoryC House 2 Home Renovations L.L.C. |
| 1555 Poydras St Ste 1200, 1200 | Renovation (Non-Structural) | $202,066 | OFFICE TENANT IMPROVEMENT OF EXISTING AECOM SUITE 1200 ON THE 12TH FLOOR. INCLUDES SELECTIVE DEMOLITION OF EXISTING NON-LOAD BEARING PARTITIONS AND FINISHES. NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING FIXTURES, NEW DOORS, FINISHES, AND MECHANICAL, AND ELECTRICAL WORK REQUIRED TO ACCOMMODATE PROPOSED INTERIOR ALTERATION. | O —A Iva AndrejevicC Highland Commercial Construction |
| 3925 Behrman Hwy | Electrical Service / Circuit / Feeder | $199,000 | New Panda Express Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Wal Mart Stores East IncA Michael A. DomingueC Michael A. Domingue |
| 1910 First St Apt 1A-Apt 2B | Renovation (Non-Structural) | $192,112 | Install Wall Sheathing, Install Frame Int Stud Wall- Rott Termite Damagem, Repair Subfloor as Needed, Repair Electrical System to Code, Replace Windows, Replace Damaged Framing, Smooth Surface Hardi Plank siding, soffit/fascia, Install New Drywall as Needed, Install Porch Awning at Upper Rear, Repair Porches, Front, Install Base and Wall Cabinets and Countertop, Install Base Trim complete with shoe, Install Interior Door, Install Pre-hung Exterior Door, Install Vinyl Flooring, Paint Exterior House Complete, Prepare Walls and Paint Room Complete, Install A/C Condenser See Sub Bid Attached, Install Hot Water Heater, Install Kitchen Sink, Install Toilet, Install Vanity w/Sink, Trim Out Electrical for Final. | O Shalom Zone Community Inc City New OrleansA Joan SawyerC — |
| 2203-2205 N Prieur St | New Construction | $153,200 | New construction of rear house (2 family) 2203-05 N. Prieur St (Small Affordable MF; part of two structures) Two family, 2 story, 4 bedroom, 2 bath, 1,492 sq. foot living area. Built according to plans. | O Katawan V FletcherA Girard CoryC House 2 Home Renovations L.L.C., House 2 Home Renovations,Llc |
| 1714 Erato St | Swimming Pool | $109,816 | New Swimming Pool for 1714 Erato St (Pool D) | O —A Parker DaviesC Louisiana Land Art, LLC |
| 1722 Erato St | Swimming Pool | $109,816 | New Swimming Pool for 1722 Erato St (Pool C) | O —A Parker DaviesC Louisiana Land Art, LLC |
| 1722 Erato St | Swimming Pool | $100,000 | New Swimming Pool for 1722 Erato St (Pool B) | O —A Parker DaviesC Louisiana Land Art, LLC |
| 4006 Royal St | Electrical Service / Circuit / Feeder | $69,152 | Installation of roof mounted PV solar panels, inverter, and Battery system. A Temporary power disconnect as well. | O Blackin MichaelA Jeffrey David CantinC Jeffrey David Cantin |
| 730 Royal St | Renovation (Non-Structural) | $48,070 | Spot tuck point as needed, caulk windows and spot paint, waterproof exterior of building where needed, Pressure Wash, install new thresholds at balcony doors, prep and paint fascia under gutter at roof edge. | O Rodrigue Realty LLCA Mark MuellerC Southeast Restoration Contractors, LLC |
| 87 French Market Pl | Renovation (Non-Structural) | $29,346 | Replace roof. | O 1228 Decatur LLCA 1228 Decatur LLCC NOLA Tawk Contracting |
| 2100 Saint Charles Ave Unit 4D | Electrical Service / Circuit / Feeder | $11,475 | Electrical work, circuits, switches, outlets, H/V/L . Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Anita C Hymel, Frederick D Weil, Pamela G Palmer, Ricnoe LLC, Mary Joanne Devlin, Koock Barbara C, Reed and Shelia Damos Family Trust NO 2, Zapletal Peter, Sandra R Duncan, Faustina Adele Balthazar, Thomas J Maher, Michael Hershfield, Beroset-Keene FA Edward Leroy DawsonC Kenneth Bordenave |
| 5845 Marshal Foch St | Electrical Service / Circuit / Feeder | $7,900 | Adding subpanel and 10 new circuits for guest house Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Matthew C ClarkA Reinaldo LopezC — |
| 2311 Saint Anthony St Apt 1B | Mechanical HVAC | $7,656 | New mini split system 24BTUs with 3 head unit and 1 condenser. | O Kairos Investments LLCA Mckinley Smith IIIC — |
| 2311 Saint Anthony St Apt 1A | Mechanical HVAC | $7,656 | New system 2ton air handler 1.5ton condenser and all new ductwork and copper. | O Kairos Investments LLCA Mckinley Smith IIIC — |
| 24014 Chef Menteur Hwy, Lot 31f | Electrical Service / Circuit / Feeder | $7,000 | Power for boat pier Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Peter G RauA Corey Danial MorganC Corey Danial Morgan |
| 9600 Lake Forest Blvd | Mechanical Fuel Gas | $6,800 | Replace corroded section of gas line piping. Troy Jeffreys, 504-232-7880. | O United States Postal ServiceA Troy A. JeffreysC — |
| 438 Canal St | Electrical Service / Circuit / Feeder | $4,850 | Build out existing restaurant. Relocate 12 outlets, add four new circuits. Replace 12 light fixtures. Use existing breaker panel. Six month vacancy inspection. Edgar Young 813-0256. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Quarter Holding LLCA Edgar NMI Young, Jr.C Edgar NMI Young, Jr. |
| 4812 Saint Charles Ave | Mechanical Fuel Gas | $4,000 | ALTERATION PROJECT@4812 Saint Charles Ave. NOLA 70115 (1) stove, (1) dryer, (1) bbq pit, (1) gas light, (2) tankless water heaters, (1) pool heater | O 4810 St Charles LLCA Kirk Maynard GarrettC — |
| 827 Canal St | Electrical Service / Circuit / Feeder | $3,500 | Installing lights, outlets, ceiling fans etc. and adding 4 circuits Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O 827 Canal St LLCA YASMEEN MONIQUE MOSLEYC YASMEEN MONIQUE MOSLEY |
| 4220 Coliseum St | Mechanical Fuel Gas | $3,450 | We will run a new high-pressure gas line approximately 130 feet to a generator | O Wesley R EustisA Randy James DeslatteC DAVID M BUSH JR |
| 4201 Canal St Apt A, Suite A | Renovation (Non-Structural) | $3,200 | change out existing awnings | O Frank W Jr PatoutA Barrio Bites Mid City LLCC Foster Custom Awnings, LLC |
| 901 Independence St | Mechanical HVAC | $3,150 | Ductwork alterations and repairs, Cleaning the indoor and outdoor coil | O Leslie E CainA Reinaldo LopezC — |
| 115 Bourbon St | Renovation (Non-Structural) | $2,500 | Change glass out in doors. Pictures are uploaded of current front of building we are asking to keep existing front and doors. We want to remove the individual glass panes on the 2 entry doors only and put 1 piece of laminated safety glass on each door. | O Bourbon Stllc 115, Canal Street Development Corp, Canal Street LTD PartnershipA Ralph Brennan Rest. GroupC — |
| 538 Madison St Unit 3C | Electrical Service / Circuit / Feeder | $2,350 | Replace existing (5) light fixtures and install (20) new recess-light fixtures. Related building permit #25-30905-RNVN. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O Steven B Lacy, Edward Kurtich, William R Jr Foster, Rodgers Gregory P Rodgers Leah T, David J Garland, Timothy D Vanfrank, 538 Properties LLC, Clement IV Lartigue, Cibilich Anthony C Cibilich Alice C, Cabes Leon J Jr Cabes Cheryl S, Richard T Ledet,A Mark A. BacquesC — |
| 1301 Chartres St Apt 2 | Renovation (Non-Structural) | $2,000 | Correct violation CCNO 166-35 within case 21-03361-DBNVCC (Shutters). Shutters repaired and to be replaced. | O Carolyn C LooperA Cox StephenC — |
| 2714 Mistletoe St -Ste 1A | Renovation (Non-Structural) | $1,550 | Electrical and plumbing vacancy . NO ADDITIONAL WORK TO BE DONE **First floor – NO USE OR OCCUPANCY; Second/Third floors combined are a single-family dwelling** | O Expresso LLCA Pieri AlessandroC Charles Joseph Laborde Jr |
| 720 Spain St Apt 2B | Mechanical Fuel Gas | $1,500 | Install 4500 W tank water heater | O Lre Management LLCA Troy Anthony KelleyC Troy Anthony Kelley |
| 720 Spain St Apt 2A | Mechanical Fuel Gas | $1,500 | Install 4500 watt store tank water heater | O Lre Management LLCA Troy Anthony KelleyC Troy Anthony Kelley |
| 720 Spain St Apt 1A | Mechanical Fuel Gas | $1,500 | install one 4500 watt tank water heater | O Lre Management LLCA Troy Anthony KelleyC Troy Anthony Kelley |
| 828 N Gayoso St Apt F | Mechanical Fuel Gas | $1,400 | electric water heater | O 2224 RQD LLCA David E HowardC — |
| 828 N Gayoso St Apt E | Mechanical Fuel Gas | $1,400 | electric water heater | O 2224 RQD LLCA David E HowardC — |
| 828 N Gayoso St Apt D | Mechanical Fuel Gas | $1,400 | electric water heater | O 2224 RQD LLCA David E HowardC — |
| 828 N Gayoso St Apt C | Mechanical Fuel Gas | $1,400 | electric water heater | O 2224 RQD LLCA David E HowardC — |
| 828 N Gayoso St Apt B | Mechanical Fuel Gas | $1,400 | electric water heater | O 2224 RQD LLCA David E HowardC — |
| 828 N Gayoso St Apt A | Mechanical Fuel Gas | $1,400 | electric water heater | O 2224 RQD LLCA David E HowardC — |
| 2019 Marais St Apt 1B | Electrical Vacancy | $1,200 | Vacancy | O John W GuerinA Oscar Lee Carter Jr.C Oscar Lee Carter Jr. |
| 2019 Marais St Apt 2B | Electrical Vacancy | $1,200 | Vacancy Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property. | O John W GuerinA Oscar Lee Carter Jr.C Oscar Lee Carter Jr. |
| 2412 Audubon St | Lead-Based Paint Form N/A | N/A | O Redmann David E JrA Redmann David E JrC — | |
| 518 Walnut St Unit C-Unit F | Change of Address N/A | N/A | 25-39643-RNVS Multi-Family, 6 Dwellings. Combining Units C and F. KEEP 518 Walnut St Unit C New Orleans, LA 70118 (AM10255493, A429932, U511193) RETIRE 518 Walnut St Unit F New Orleans, LA 70118 RETIRE 7006 Dominican St Unit F New Orleans, LA 70118(AM11665333, A438051) | O Lot 7 Nola LLC, Paul J Masinter, Dawson Mark Edward P, Audubon Park Investment LLC, Walnut 1972 LLC, Mark Edward Peter DawsonA Mark Edward Peter DawsonC — |
| 2021 Law St | Electrical Service / Circuit / Feeder N/A | N/A | Repair Electrical Meter Socket | O Nkc Realty LLCA Joseph Benjamin RobinsonC Joseph Benjamin Robinson |
| 733 Allen Toussaint Blvd | Small Cell Installation N/A | N/A | CRAN_RBHM_LNOLK_006: proposed metal pole. Node will be powered by an aerial service wire from a pole in the median of Allen Toussaint Blvd. AT&T/MasTec will place a weather head on the new pole. A copper wire will be terminated on the disconnect panel on one end and there needs to be 25' coil out the top of the weather head. AT&T wireline handhole will be at the base of the small cell pole. No work for MasTec will require a permit. | O —A AT&T OSP ENGINEERINGC Mastec Network Solutions Inc |
| 6122 Saint Claude Ave | Renovation (Non-Structural) N/A | N/A | I would like to "add" a use to the property. I would like to open a snowball stand NO WORK TO BE DONE | O St Cyr DominiqueA Dominique StcyrC — |